Route PlannerעבEN

Green Line — light rail in Gush Dan (Green)

Green Line is light rail Under construction in the Gush Dan rail transit network. Opening estimated: 2028–2030 (projected). Below is a description of the route, the cities it will serve and the planned stations as far as published.

Under construction

Status

light rail

Line type

2028–2030

Expected opening

35 km

Planned length

🚧

Green Line — Under construction

Opening estimated: 2028–2030 (projected). The line is not yet operational — today only the Red Line is running. This page will be updated as construction progresses and official information is published.

The route and cities served by Green Line

The Green Line is a light-rail line under construction that will connect Rishon LeZion in the south with Herzliya and Ramat HaHayal in the north, with two northern branches. The line will pass through Tel Aviv and connect to the Red Line at Arlozorov station.

Planned stations

Provisional list, subject to change. The station list below is based on public sources (Wikipedia and early plans) and is not final — names, locations and the number of stations may change before the line opens.
  • Abba Eban
  • Neveh Sharet
  • HaHoshlim
  • Dvora HaNevi'a
  • Altneuland
  • HaNehoshet
  • Hof HaTkhelet North
  • HaBarzel
  • Hof HaTkhelet South
  • Pinchas Rosen
  • Unichman
  • Stadium
  • Levinsky College North
  • HaYarkon Park
  • Levinsky College South
  • Gane HaTa'arukha
  • Shoshanna Parsitz
  • Rosenfeld
  • Azore Hen
  • University
  • Propes
  • Brodetsky
  • HaGush HaGadol
  • Namir
  • Levi Eshkol
  • Einstein
  • Dov
  • Reading
  • Nordau
  • Arlosoroff West
  • Rabin
  • Kaplan
  • Carlebach
  • Levinski
  • Hizkiyahu
  • Kibbuts Galuyot
  • Abu Kabir
  • Gittit
  • Holon Junction
  • Yad LaBanim
  • HaHistadrut
  • HaNesi'im
  • Golda
  • Krauze
  • Lavun
  • Serlin
  • Begin
  • Ge'ullim
  • Hayyim Sharon
  • HeHarash
  • Laskov
  • HaMelakha
  • Khet-500
  • Mifrats Shlomo
  • Sakharov
  • HaMerkava
  • Avnei Choshen
  • Holon Depot
  • Lishansky
  • HaYovel
  • Dayan Terminal
  • Agricultural Center

62 planned stations (provisional list).

🔖

Bookmark this site before your next trip

We keep telavivmetro.org with every change — to operating hours, fares, service disruptions or any important announcement about the Gush Dan light rail and metro. Save this page and check it before you travel to stay up to date.

Frequently asked questions

No. Green Line is currently Under construction (Opening estimated: 2028–2030 (projected)). Today only the Red Line is operating on the network. We update this page with every official development.
Opening estimated: 2028–2030 (projected). This is an estimate only — opening dates for infrastructure projects may change. Add this page to your favourites for updates.
The Green Line is a light-rail line under construction that will connect Rishon LeZion in the south with Herzliya and Ramat HaHayal in the north, with two northern branches. The line will pass through Tel Aviv and connect to the Red Line at Arlozorov station.
The line combines underground segments and street-level segments, similar to the Red Line — the final details will be published as construction progresses.

On this page