Green Line — light rail in Gush Dan (Green)
Green Line is light rail Under construction in the Gush Dan rail transit network. Opening estimated: 2028–2030 (projected). Below is a description of the route, the cities it will serve and the planned stations as far as published.
Status
Line type
Expected opening
Planned length
Green Line — Under construction
Opening estimated: 2028–2030 (projected). The line is not yet operational — today only the Red Line is running. This page will be updated as construction progresses and official information is published.
The route and cities served by Green Line
The Green Line is a light-rail line under construction that will connect Rishon LeZion in the south with Herzliya and Ramat HaHayal in the north, with two northern branches. The line will pass through Tel Aviv and connect to the Red Line at Arlozorov station.
Planned stations
- Abba Eban
- Neveh Sharet
- HaHoshlim
- Dvora HaNevi'a
- Altneuland
- HaNehoshet
- Hof HaTkhelet North
- HaBarzel
- Hof HaTkhelet South
- Pinchas Rosen
- Unichman
- Stadium
- Levinsky College North
- HaYarkon Park
- Levinsky College South
- Gane HaTa'arukha
- Shoshanna Parsitz
- Rosenfeld
- Azore Hen
- University
- Propes
- Brodetsky
- HaGush HaGadol
- Namir
- Levi Eshkol
- Einstein
- Dov
- Reading
- Nordau
- Arlosoroff West
- Rabin
- Kaplan
- Carlebach
- Levinski
- Hizkiyahu
- Kibbuts Galuyot
- Abu Kabir
- Gittit
- Holon Junction
- Yad LaBanim
- HaHistadrut
- HaNesi'im
- Golda
- Krauze
- Lavun
- Serlin
- Begin
- Ge'ullim
- Hayyim Sharon
- HeHarash
- Laskov
- HaMelakha
- Khet-500
- Mifrats Shlomo
- Sakharov
- HaMerkava
- Avnei Choshen
- Holon Depot
- Lishansky
- HaYovel
- Dayan Terminal
- Agricultural Center
62 planned stations (provisional list).